Resin Driveway Contractors

Edinburgh · Scotland

Dropped kerb applications in Queensferry

A new or wider vehicle crossing in Queensferry needs consent from your council as roads authority. We prepare the drawings and photos, then time your drive to meet the new kerb level.

Guide price
about £1,000–£2,500 per crossing, set by the highway authority
Postcodes
EH30
Survey
Free, no obligation
Computer-generated exampleDropped kerb applications: computer-generated example

What dropped kerb applications involve

A dropped kerb, or vehicle crossover, is a lowered section of kerb and strengthened pavement that lets a car cross the footway to reach a driveway. It needs consent from the highway authority (your council in England, Wales and Scotland; DfI Roads in Northern Ireland), and the work in the pavement is done by that authority or a contractor it approves.

In Queensferry, the survey for this work is about levels, falls and ground conditions: where water goes now, what is under the surface and how materials will reach the site. Plots around Queensferry are often generous, so turning areas and longer runs of edging are part of many quotes.

Across Edinburgh, the projects we price include preparing a drive to meet a new dropped kerb, adding a soakaway so water stays on the property and replacing failed edges that have started to crumble. More about dropped kerb applications.

Prices for dropped kerb applications in Queensferry

Prices in Lothian are a little below the UK average. These are guide ranges including VAT; your quote follows a free survey.

Guide prices in Queensferry
ServiceGuide price inc VAT
Dropped kerb applicationsabout £1,000–£2,500 per crossing, set by the highway authority
Driveway drainage and soakaways£45–£100 per linear metre
Resin over tarmac and concrete£40–£65 per m²

Based on Lothian rates. See the full price guide or price your own project.

Planning in Queensferry

A dropped kerb always needs consent from your council as roads authority, whether or not the driveway itself needs planning permission. A new access onto a classified road can need planning permission as well.

General information for Scotland, not legal advice.

Weather and working days

Lothian is one of the drier parts of Scotland, but cold winters and frost make a well-drained, frost-resistant base important. Spring to autumn offers the most laying days in Edinburgh, but dry, mild winter days can work too.

How it works

You start with a guide price, we visit to measure and check the site, you get a written quote, and we book the work for suitable weather.

Dropped kerb applications in Queensferry: questions

What postcodes do you cover around Queensferry?

We cover EH30 and the surrounding districts, including Currie and Colinton.

How soon can you survey in Queensferry?

Call 0800 088 6341 or use the quote tool and we will offer survey dates. Surveys are free and run all year.

Who approves dropped kerbs in Queensferry?

Dropped kerb consent comes from your council as roads authority. We help with the application and get your drive ready to meet the new crossing.

Free survey · itemised quote

Book a free survey in Queensferry

We cover EH30 and nearby. Tell us about your project and we will be in touch to arrange a visit.

  • Base, edging and drainage priced line by line
  • Real blend samples shown in daylight
  • Price fixed in writing once the spec is agreed

Prefer to talk? 0800 088 6341 or

Get your free survey and written quote

No obligation. We use your details only to arrange your survey and quote.

Call Guide price