Excavation and sub-base work is the groundwork under a resin surface: digging out the old drive and soft ground, removing the spoil, and building up compacted layers of crushed stone and a binder course that will carry cars without moving.
- Guide price
- Priced after survey
- Time on site
- 1–3 days for most domestic drives
- Permeable
- Depends on build

How excavation and sub-base works
Base preparation is commonly 30–45% of a new resin drive budget, and it is where corners get cut. A thin base, unwashed fines in a permeable build, or poor compaction show up as cracks and dips within a few winters.
Depth depends on the ground and the load. Clay, made ground and old garden soil need more depth than firm gravelly ground. Where services such as water pipes or cables run shallow, they are located before digging.
Is it right for you?
- Your new drive needs a base
- Your old drive is sinking or breaking up
- You are converting lawn or gravel to resin
How we do it
- Locate services
- Excavate to formation level
- Remove spoil by grab lorry or skip
- Lay geotextile where needed
- Lay and compact sub-base in layers
- Lay binder course
Specification
- Typical depth 150–250 mm for domestic drives
- Type 1 (sealed builds) or open-graded stone (permeable builds)
- Compaction in layers with a plate or roller
- Porous asphalt or concrete binder
Pros
- Prevents most resin failures
- Allows a fully permeable build
- Fixes levels and falls
Things to know
- Adds cost and time
- Needs space for machinery and spoil removal
Planning and permissions
General information, not legal advice. Pick your nation:
England
Groundworks for a domestic drive do not usually need planning permission in themselves, but the finished surface follows the front-garden drainage rules, and shallow services such as water pipes and cables are located before digging.
Wales
Groundworks for a domestic drive do not usually need planning permission in themselves, but the finished surface follows the front-garden drainage rules, and shallow services such as water pipes and cables are located before digging.
Scotland
Groundworks for a domestic drive do not usually need planning permission in themselves, but the finished surface follows the front-garden drainage rules, and shallow services such as water pipes and cables are located before digging.
Northern Ireland
Groundworks for a domestic drive do not usually need planning permission in themselves, but the finished surface follows the front-garden drainage rules, and shallow services such as water pipes and cables are located before digging.
Excavation and sub-base: common questions
Why is the base so important?
Resin bound is thin and copies whatever is under it. A weak or uneven base shows through as cracks, dips and loose patches.
Excavation and sub-base near you
- Aberdeenshire
- Angus and Dundee
- Argyll and Bute
- Ayrshire
- Bedfordshire
- Berkshire
- Bristol
- Buckinghamshire
- Cambridgeshire
- Cheshire
- Clwyd
- Cornwall
- County Antrim
- County Armagh
- County Down
- County Durham
- County Fermanagh
- County Londonderry
- County Tyrone
- Cumbria
- Derbyshire
- Devon
- Dorset
- Dumfries and Galloway
- Dunbartonshire
- Dyfed
- East Riding of Yorkshire
- East Sussex
- Edinburgh
- Essex
- Fife
- Forth Valley
- Glasgow
- Gloucestershire
- Greater London
- Greater Manchester
- Gwent
- Gwynedd
- Hampshire
- Herefordshire
- Hertfordshire
- Highlands and Islands
- Isle of Wight
- Kent
- Lanarkshire
- Lancashire
- Leicestershire
- Lincolnshire
- Lothians
- Merseyside
- Mid Glamorgan
- Moray
- Norfolk
- North Yorkshire
- Northamptonshire
- Northumberland
- Nottinghamshire
- Oxfordshire
- Perth and Kinross
- Powys
- Renfrewshire and Inverclyde
- Rutland
- Scottish Borders
- Shropshire
- Somerset
- South Glamorgan
- South Yorkshire
- Staffordshire
- Suffolk
- Surrey
- Tyne and Wear
- Warwickshire
- West Glamorgan
- West Midlands
- West Sussex
- West Yorkshire
- Wiltshire
- Worcestershire
Related services
Driveway drainage and soakawaysChannel drains and soakaways so water never runs to the road.Learn more
Driveway edging and bordersGranite setts, block, steel or timber edges that hold the line.Learn more
Dropped kerb applicationsHelp with highway authority consent for a new or wider vehicle crossing.Learn more
Free survey · itemised quote
Get a quote for excavation and sub-base
Free survey, real samples and an itemised written quote.
- Base, edging and drainage priced line by line
- Real blend samples shown in daylight
- Price fixed in writing once the spec is agreed
Prefer to talk? 0800 088 6341 or